Client name: Project Laddaw
Location : Leicestershire
Type of installation : Warehouse
Required spec:
Heating and ventilation
100% fresh air in summer
Heating to 16C
Fast track installation
Details:
The key HVAC system design criteria for this new Autoglass warehouse was the requirement for a controlled 16oC throughout the space. Two Balanced Jet systems serve the development which consists of a racked area and offices. All plants are designed to operate with the capability of supplying 100% fresh air in the summer.
Client website :
Click here to print this case study
< Previous page
|